A London consultancy for building compliance020 3886 3488info@regulabuild.co.uk
Illustration: a brick house shown in cutaway, with its walls, roof and insulation
  1. Home
  2. Services
  3. Building projects
  4. Energy & performance calculations

Building projects

Energy and performance calculations

The calculations that show a design meets Part L, Part O and Part G before work starts, and the as-built figures building control asks for at completion.

12 servicesParts G, L and OOne written quotation for any combination

In this group

12 services, each scoped in writing.

Add the ones you think apply and we will combine them into one quote request. If you are unsure, add your best guess and tell us about the project.

  • Energy and SAP calculations

    Design-stage and as-built SAP calculations for new and converted homes, with the EPC lodged at completion.

    Part L · Design stage

  • SBEM and BRUKL calculations

    Energy compliance calculations for new buildings other than homes, and some extensions, with the BRUKL output report.

    Part L · Design stage

  • Energy statements

    Energy and carbon statements for planning applications, written to the local plan policy that applies.

    Planning · Design stage

  • Overheating assessments

    Simplified method or dynamic modelling to show new homes and other new residential buildings limit overheating in summer.

    Part O · Design stage

  • U-value calculations

    Heat-loss calculations for walls, floors and roofs, so the specification can be checked before build.

    Part L · Design stage

  • Thermal bridging and psi-values

    Junction calculations that replace default values in SAP and can improve the result.

    Part L · Design stage

  • Overglazed extension calculations

    Calculations showing an extension with generous glazing still meets the energy standard.

    Part L · Design stage

  • Part L evidence support

    Photographic evidence and the BREL report, gathered during the build and issued at completion.

    Part L · During the build

  • Sustainability statements

    Statements covering energy, water, materials and waste for planning submissions.

    Planning · Design stage

  • BREEAM assessment support

    Support through BREEAM pre-assessment, design and post-construction stages.

    Planning · Design stage

  • Daylight and sunlight assessments

    Daylight to new rooms, and the effect of a scheme on neighbouring properties.

    Planning · Design stage

  • Water efficiency calculations

    Calculations showing new homes meet the water use limit: 125 litres per person per day, or 110 where a planning condition requires it.

    Part G · Design stage

Timing

When these are usually needed.

Most of this work falls at design stage or just before completion. Booking early avoids delays at sign-off.

Guidance on this page refers to Building Regulations in England. What applies depends on the building and the work, and your quotation confirms it. Approval and completion decisions remain with your building control body.

Request a quote

Not sure which of these you need?

Tell us about the building and the stage it has reached. We will set out what applies in a written quotation.

CallRequest a Quote