A London consultancy for building compliance020 3886 3488info@regulabuild.co.uk
Illustration: two new brick houses, one shown in cutaway
  1. Home
  2. Projects
  3. New build homes

Project guide

Building new homes

A new home needs energy, water and overheating calculations at design stage, then testing and as-built evidence before building control will sign it off.

Usually 10 servicesOver 3 stages

What it usually involves

Your project, stage by stage.

Untick anything you already have in hand. The rest goes into one quote request, and we confirm what actually applies once we have seen the details.

1Design stage

2During the build

3Before completion

10 services selected

You can add or remove services on the next page.

Guidance refers to England. Requirements vary by project and building control route, and your quotation confirms what applies. Approval and completion decisions remain with your building control body.

Request a quote

Tell us about your project.

A short description and early drawings are enough to start. We confirm the scope, deliverables and price in writing.

CallRequest a Quote