Ventilation testing
Airflow measurement of extract fans and ventilation systems, with commissioning records for building control.

Design & approvals
A qualified ventilation engineer designs the ventilation strategy and system for your building so it is set up to meet Part F before work starts. You receive a design with flow rates, equipment and vent positions that installers and building control can follow.
Part F requires adequate ventilation for the people in a building. New homes need a system suited to how airtight they will be, such as background ventilators with extract fans, continuous mechanical extract, or mechanical supply and extract with heat recovery. Work on existing homes, such as replacing windows or adding rooms, should not leave ventilation worse than before.
Mechanical ventilation in new homes is airflow tested before completion, and the design flow rates are the target the installer works to. A new edition of Approved Document F volume 1 applies from 24 March 2027 with the Future Homes Standard, subject to transitional arrangements, so we confirm which edition applies when we scope the job.
Your written quotation confirms the exact scope, what is included and any limits for your building.
A ventilation design setting out the strategy, room by room flow rates, and a layout of equipment, ducts and vents, ready for building control and your installer.
Sent as a PDF. We can send it to your building control body or agent on request.
Our reports and testing support the compliance process. Approval and completion decisions remain with your building control body: the local authority, a registered building control approver, or the Building Safety Regulator for higher-risk buildings.
Send what you have. Missing details will not stop an enquiry; we will tell you anything still needed.
It depends mainly on how airtight the home will be and its layout. We recommend a strategy at design stage, while it can still be coordinated with the energy calculation.
No. Design sets the flow rates and layout. Testing measures what the installed system delivers at completion and is a separate service.
Approved Document F volume 1 has a new edition that applies from 24 March 2027, subject to transitional arrangements. Which edition applies depends on your project dates.
Often booked with
Airflow measurement of extract fans and ventilation systems, with commissioning records for building control.
Setting up and balancing whole-house heat recovery systems to the design flow rates.
Design-stage and as-built SAP calculations for new and converted homes, with the EPC lodged at completion.
Where we work
Request a quote
Start with this service and add anything else you need. If you are unsure, say so and we will advise.