A London consultancy for building compliance020 3886 3488info@regulabuild.co.uk
Illustration: a technical section drawing of a protected stair in a block of flats
  1. Home
  2. Services
  3. Design & approvals
  4. Fire strategy and design advice

Design & approvals

Fire strategy and design advice

A qualified fire engineer sets out how a building is designed to meet Part B: means of escape, fire spread, compartmentation, detection and fire service access. You receive a fire strategy report for building control and, where needed, a fire statement for planning.

Part BDesign stageBuilding projects
Request a Quote

When you need it

Building control needs to see how a design meets Part B. For a house this is often shown on the drawings; flats, conversions, commercial premises and mixed-use buildings usually need a written fire strategy. Approved Document B is the usual guidance, but other ways of complying can be used where suitable, such as BS 9999, BS 9991 or a fire engineered approach.

Planning can ask for fire information too. Under planning gateway one, applications for buildings of 18 metres or seven storeys or more with two or more homes need a fire statement on the government form, and in London, Policy D12 of the London Plan asks for a fire statement with major applications.

Work to buildings covered by the Fire Safety Order must use a full plans application. Fire safety information then has to be handed to the responsible person by completion or occupation, and the strategy forms part of it.

What is included

Included

  • Review of drawings, use and expected occupancy
  • Means of escape, compartmentation, fire spread and fire service access assessed against the chosen guidance
  • Fire strategy report with marked-up plans
  • Fire statement for planning, where required
  • Responses to building control queries on the strategy

Priced separately

  • Fire engineering modelling, such as smoke or evacuation simulation
  • Design of fire alarm, sprinkler or smoke control systems
  • Fire risk assessment once the building is in use
  • Revisions after design changes

Your written quotation confirms the exact scope, what is included and any limits for your building.

What you receive

A fire strategy report with marked-up plans for your building control application, and a fire statement for planning where the scheme needs one. The strategy also feeds the fire safety information handed over at completion.

Sent as a PDF. We can send it to your building control body or agent on request.

Our reports and testing support the compliance process. Approval and completion decisions remain with your building control body: the local authority, a registered building control approver, or the Building Safety Regulator for higher-risk buildings.

How to prepare

  • Plans, sections and elevations
  • Proposed use and expected number of occupants
  • Building height and number of storeys
  • Planning status and any fire-related planning conditions
  • Proposed alarm, sprinkler or smoke control provisions
  • Details of the existing building, for alterations

Send what you have. Missing details will not stop an enquiry; we will tell you anything still needed.

How it works

Tell usChoose the service or describe the job.
Written quotationScope, deliverables and price, confirmed in writing.
We manage the workArranged and coordinated by RegulaBuild. Technical work is carried out by appropriately qualified professionals.
Your reportThe output named in your quotation, with any follow-up.

Questions

What is the difference between a fire strategy and a fire risk assessment?

A fire strategy is a design document showing how the building is intended to meet Part B. A fire risk assessment is required under the Fire Safety Order once premises are in use, and is kept under review.

Does a higher-risk building need more?

Yes. Building control approval comes from the Building Safety Regulator, which expects detailed fire information before work can start. We confirm the scope in the quotation.

Will building control accept the strategy?

We prepare it to the guidance your building control body expects, but approval decisions rest with them.

Often booked with

Combine them in one quote request

Approvals

Building Regulations applications

Preparing and managing your Building Regulations application through the route that suits the project: the local authority, a registered building control approver, or the Building Safety Regulator for higher-risk buildings.

Design and approvalsView service

Request a quote

Discuss fire strategy and design advice

Start with this service and add anything else you need. If you are unsure, say so and we will advise.

CallRequest a Quote